Every case. Every deadline.

Hit every Awaab's Law deadline, and prove it

Log the concern, act inside the fixed timeframes, and show what happened at every step — with the evidence assembled as the work happens, not afterwards.

A moisture reading being taken from a damp, mouldy ceiling
  • 24hremergency response tracked
  • Everyaction timestamped
  • 1case record, not four systems
  • Oct 2025in force across social housing in England
  • Notting Hill Genesis
  • A2Dominion
  • Westward
  • Kāinga Ora
  • Raven Housing Trust
  • Inclusion Housing
  • City of Westminster
  • Sage Homes
  • HAUSIN

What it means

For the resident

The clock starts the day you report it, and somebody is answerable for meeting it — not for explaining afterwards why it was missed.

For your Compliance and Repairs teams

Timescales are generated at the point of report and flagged before they are breached, rather than discovered after.

What the duty actually requires

A surveyor recording a damp and mould inspection on a tablet

Rapid action on emergencies

Where a hazard presents a significant and imminent risk, the response window is 24 hours. That cannot depend on someone noticing a report in a queue.

Timely investigation

Reported damp and mould has to be investigated inside a fixed timeframe, and the resident told in writing what was found.

Records that hold up

Inspections, photographs, decisions, repairs and updates to the resident — the evidence has to exist, not be reconstructed later.

Transparency for the resident

The household is entitled to know what was found and what will be done about it, without having to ask.

How it works

The path from first conversation to live running, and what happens at each step.

  1. Cases open themselves

    Cases are created from resident reports, repair descriptions or inspection findings — so a hazard mentioned inside an ordinary repair does not stay inside one.

  2. Deadlines are tracked for you

    The system watches emergency and investigation timeframes and nudges the responsible person while there is still time to act.

  3. Evidence is gathered as you work

    Photographs, notes, moisture readings, risk scores, works orders and correspondence stay attached to the case rather than scattered across inboxes.

  4. The resident gets a plain summary

    After an inspection, a resident-friendly report goes out: what was found, what happens next, and when they will hear again.

  5. Repeat problems surface

    When an address re-opens, the history is already there — trends are visible and escalation is automatic rather than discretionary.

Damp and mould, from report to resolution

How a hazard report starts the clock, and what happens at each stage.

Before and after: Awaab's Law compliance

Every system demonstrates well. What matters is the difference in an ordinary working week — the steps that disappear, the chasing that stops, and the questions your team can answer on the spot instead of promising to look into it.

TodayWith Propsys360
A damp report sits in the general repairs queue until somebody spots it.The report opens a case with an owner and a due date the moment it arrives.
Nobody knows a deadline is at risk until it has already been missed.Time remaining is visible on every case, and the right person is warned before it slips.
The evidence pack is rebuilt from four systems when a claim or an inspection arrives.Photographs, readings, correspondence and works orders attach to the case as it progresses.

What Awaab's Law compliance has to get right

Housing runs on specifics — statutory timescales, tenure types, the return that has to be filed next month. This is the detail that decides whether a system survives contact with your operation, and the reason a general-purpose platform usually cannot.

  • Case management with SLA timers and automatic escalation
  • Inspection forms on mobile and desktop, online or offline
  • Photo and document capture, timestamped against the case
  • Repairs workflow with contractor hand-offs
  • Resident updates by email and SMS, logged
  • Case status by stage: reported, inspected, works ordered, verified complete
  • SLA performance against emergency and investigation timeframes
  • Addresses with repeated damp and mould cases
  • Before and after photographs and moisture readings
  • Export for regulators, auditors and board papers

More of the platform

Each part of Propsys360 works from the same tenancy, property and person record, so nothing is re-keyed and nothing drifts out of step. Most providers start with one or two and add the rest as their existing contracts end.

Integration Platform & Tools

Fits what you already run

Propsys360 connects to the housing, finance, field and compliance systems you already use, orchestrates the processes between them, and replaces the legacy platforms you want to leave behind.

25+Systems we integrate with 15+Systems we migrate from
  • Microsoft and data
  • Finance and payments
  • Repairs and contractors
  • Residents and compliance
See all integrations and open standards →

Trusted housing technology for housing associations, councils and public-sector landlords

  • 557KTenants supported
  • 1.5M+Repairs managed
  • £57M+Repairs processed p.a.
  • 4.75MCustomer cases
  • 500KArrears cases managed
  • G-Cloud 15 Supplier
  • Microsoft Solutions Partner
  • Cyber Essentials Plus Certified
  • Cyber Essentials Certified
  • ISO 9001
  • ISO 27001
  • ISO 20000-1
  • ISO 14001

The difference it makes

17systems brought into one viewNotting Hill Genesis, building safety golden thread — separate systems consolidated into a single compliance picture
£250k p.a.saved through unified reportingEstimated staff time saved annually by replacing manual, multi-system reporting with a single view

Source: Results reported by housing providers using Propsys360; illustrative where stated. Individual results vary.

What housing providers say

Named people at named organisations, in their own published words.

“We realised that we had a gap around the golden thread of data, in terms of the availability and accessibility of the data we held in seventeen different systems… That meant colleagues could immediately see all non-compliant properties.”
Notting Hill Genesis logo

Jake Le Page Head of Building Safety Regulations Notting Hill Genesis

“Neo brought strong Dynamics 365 expertise, worked collaboratively with our internal teams and applied Microsoft best practice within a live operational environment… We would be pleased to recommend them as a Microsoft Dynamics 365 partner within the housing sector.”
Sage Homes logo

Wayne Human Head of IT Change Sage Homes

“The successful deployment of this solution has significantly increased transparency and improved the operational efficiency of our contact centre, allowing us to deliver greater value to our customers.”
VIVID

Philip Wragg Infrastructure Programme Manager

“The Neo Technology model allows us to scale our development capacity, accelerating our transformation programmes while future-proofing our business, while achieving substantial industry cost savings.”
Notting Hill Genesis logo

Group CIO Notting Hill Genesis

Proof from housing providers

Frequently asked questions

When did Awaab's Law come into force?

It applies across social housing in England from 27 October 2025. Confirm the current timescales against the legislation itself — the duty has been through several iterations and the published figures have changed.

Does this replace our repairs process?

No. A hazard case runs alongside the repair and links to it, so the statutory clock is tracked separately from the works order while both refer to the same property and household.

What happens if a deadline is going to be missed anyway?

You find out before it happens rather than after, which is the difference between managing an exception and explaining a breach. The record shows what was done and when, which is what an investigation examines.

Can we use this for hazards other than damp and mould?

Yes. The same case framework covers the wider set of hazards, so extending scope is configuration rather than a new project.

See a hazard case run end to end

We will walk one through from the resident's report to the evidence pack, using your own timescales.

Get the guide

Tell us who you are and the guide downloads straight away.